2.4 Million CY with a 6 Month Deadline
W. S. Newell was tasked with moving 2,400,000 CY of unclassified excavation which had to be completed within 6 months. The 300 acre site included structural and non-structural areas along with a 21 acre detention pond.
CLICK THE HEADLINE TO SEE THE VIDEO!